Mackenzie Secondary

Four renovation phases started Jul/2000 to the end of 2006, including Gym reno.
CONSTRUCTION COST $2,600,000.

College Heights Secondary

Addition and renovation.
Construction completed Dec 2008.
CONSTRUCTION COST $4,400,000.

Heather Park Middle School

This school was built in Prince George with construction starting in October 1999 and was ready for the start of classes September 2000. The middle school concept of educating grades 6, 7 and 8 together in one building was a first for School District #57. Wayne Watson Construction Ltd. was awarded the contract in late 1999 and started on the construction immediately.
The school is a two storey, 66,000 square foot per floor, wood frame structure, and was built with the co-operation of Wood Works BC. The school is designed to provide the needs of 750 Students. The roughly 125,000 sq foot of floor space is divided into: 25 regular classrooms, 2 Science labs, 2 Computer labs, a Construction room, Home Economics, Technology, Library, Art room, 4 Specialty classrooms, Staff areas, Multipurpose / Drama Rooms, Gymnasium and Change rooms.
CONSTRUCTION COST $6,000,000.00

Kelly Road Secondary

Constructed during the 1994/1995 season for the Prince George School District. The substantial portion of the work was to retrofit the existing school up to standards. The addition portion of the school is photographed. A portion of the school dates back to the 1960’s and renovations and additions continued each decade. Our work was scheduled around the existing building and a functioning school of 1000 students. Challenging and fun best describes this project.
CONSTRUCTION COST $6,800,000.00

HVAC

Several HVAC updates at various schools throughout the north:

DP Todd Secondary in Prince George, October 2008.
CONSTRUCTION COST $551,400

Vanway & Foothills Elementary in Prince George, August 2008.
CONSTRUCTION COST $747,600

Thornhill Elementary in Terrace, July 2008.
CONSTRUCTION COST $301,000

DP Todd Secondary in Prince George, August 2007.
CONSTRUCTION COST $232,030

DP Todd Secondary in Prince George, September 2005.
CONSTRUCTION COST $270,962

Prince George Secondary in Prince George, January 2005.
CONSTRUCTION COST $109,000